The Hallé Orchestra opened a new practice base in Manchester, after successfully renovating a derelict church into an imposing performance hall.. A purpose built demountable stage was required the match the ecclesiastical setting and CPS were enlisted to design and supply the equipment. The Stage was fitted with a high quality durable Karndean floor which blended in with the surroundings. The stage consisted of Alu Combi platforms used in conjunction with Alu Rapids where bespoke platforms were needed to fit around pillars.